Our Scope of Work
- Power Access: Discreet, intelligently placed outlets, floor boxes, and trunking systems ensure staff can plug in where they need, without compromise.
- Connectivity Backbone: A full Cat 6 network was installed to provide high-speed, reliable connections throughout the building.
- Lighting Atmosphere: A tailored mix of recessed LEDs, feature pendants, and spotlights shaped a bright, functional workspace with real character.
- Digital Infrastructure: Wi-Fi points, AV setups, and comms rooms were integrated from day one, future-proofing the building for evolving tech needs.
- Attention to Detail: Final fittings were fine-tuned around the finished interiors, ensuring seamless integration with bespoke furniture and layouts.
Impact
The result is a workspace that’s not only visually striking but engineered for performance. Delivered on schedule and ready to adapt with the business, the installation forms the backbone of Improve International’s next chapter.
Testimonial from Steve Bath, Project Team Lead – Kerr Office Group
“The Improve International project was a large-scale, high-spec undertaking, requiring a comprehensive electrical, data, and lighting installation for a state-of-the-art veterinary training facility. Hislop provided exceptional support, expert advice, and dependable service throughout. They ensured timely delivery of both materials and labour, keeping the project on schedule. Despite numerous variations and additional works, everything was quoted and managed efficiently. The final installation was completed to a high standard, and the client was extremely pleased with the end result.”
We worked alongside Kerry Office Group to bring this project to life!
- Project Type
Commercial
- Project Location
Swindon, Wiltshire
- Client
Kerr Office Group
- Completion Date
2024
- Project Lead
Jonathan Baker
If you have a project in mind, large or small – get in touch today! Via our Contact Us page.